Geochemistry Assessments for Enhanced Bioremediation System

EHS Support was engaged to undertake a geochemistry assessment to inform the design of an Enhanced Bioremediation System for the clean‑up of a 4.5‑hectare light non-aqueous phase liquid (LNAPL) plume at a mine site in the Northern Territory.

The proposed clean-up of the LNAPL plume focused on enhanced bioremediation through groundwater extraction, amendment, and re-injection. Amendments to the injected groundwater would be selected to promote microbial degradation of the LNAPL and associated dissolved‑phase hydrocarbons.

EHS Support initially undertook various rounds of natural source zone depletion and monitored natural attenuation assessments to identify the primary mechanisms in which biodegradation naturally occurred.

A geochemistry assessment was then conducted to identify what variables may be limiting the rate at which natural biodegradation is occurring; what additives should be added to enhance the rate of biodegradation, resulting in quicker remediation timeframes; and potential risk that may occur through the use of additives such as clogging the aquifer or mobilising naturally occurring metals.

A comprehensive drilling program was undertaken using sonic drilling methods to collect soil and groundwater samples. These samples helped EHS Support to understand what minerals were present in the aquifer, identify metals that could become a problem, and model how different additives might behave in the aquifer under site-specific conditions such as pH and redox potential.

EHS Support then undertook geochemical modelling, looking at three possible additives: oxygen, phosphorus, and sulphate. The results showed the aquifer contained abundant naturally occurring reactive iron, and that iron was the main electron acceptor promoting microbes to break down the hydrocarbons under natural conditions.

As such, the use of oxygen—which is a preferred electron receptor for microbes to use—was not recommended as it would react with dissolved iron and manganese, which would precipitate and result in clogging of the aquifer and injection points. Due to the abundance of iron, it was also determined that microbes were unlikely to use sulphate to break down the contamination, because iron was the preferred elector acceptor under current geochemical conditions. These results match historical cleanup trials where oxygen-releasing products, air sparging, and sulphate treatments were not effective.

The assessment found that phosphorus was the most promising additive. It does not directly drive the breakdown process, but it can give microbes the nutrients they need to grow and thrive. This was supported by bench‑trial investigations that indicated phosphorus additives resulted in better microbial growth.

EHS Support recommended the Stage 1 remediation design be developed, which initially incorporated the use of phosphorous amendments; and that the system be designed to provide flexibility, so different amendments could be added as understanding of system performance improves and remediation objectives and goals become more refined.

See more of our project experience.