A comprehensive Groundwater Dependent Ecosystem (GDE) Evaluation and Monitoring Work Plan has been prepared to support Mt Hotham Airport Pty Ltd’s application for a variation to an existing licence to take and use water from a bore, in accordance with the Goulburn Murray Water (GMW) Groundwater Pumping Impact Assessment (GPIA) guidelines.
The assessment examines local groundwater conditions, surrounding waterways, wetlands, alpine bogs and vegetation communities to understand their potential reliance on groundwater. Desktop studies and specialist ecological inputs identified several high value GDEs in the broader area, including alpine bogs and nearby waterways, while confirming that existing groundwater use has not resulted in documented environmental impacts.
The proposed development will increase groundwater use in a staged and seasonal manner, with peak extraction occurring during winter when rainfall and snowmelt are highest. Hydrogeological analysis indicates that groundwater recharge in the area significantly exceeds proposed extraction volumes, and there are no nearby licensed groundwater users likely to be affected. While some uncertainty remains around local groundwater–ecosystem connections, the overall risk to GDEs is considered low, particularly given the modest increase in licensed volumes and the timing of water use.
To manage potential risks, a precautionary, adaptive monitoring program will be implemented before and during operations. This includes installing groundwater monitoring bores near sensitive ecosystems, continuous groundwater level monitoring, periodic water quality testing, and annual ecological assessments of alpine bogs. Clear trigger levels and adaptive management measures will ensure groundwater extraction can be adjusted if required, prioritising the protection of high value ecosystems while supporting the long term operation of the airport.
