At the request of Alpine Shire Council, EHS Support prepared a Drilling Report on a new groundwater bore installed at Dinner Plain, Victoria. The bore was installed to help provide a reliable water source for seasonal snowmaking, while helping protect the town’s potable water supply during peak winter demand.
Completed in late 2024, the project involved drilling to 175 metres, installing the bore and carrying out a 24-hour pumping test to confirm how much water can be sustainably drawn from the local basalt aquifer.
The testing indicates the bore can operate at about 1.6 litres per second for a full day, with groundwater levels recovering quickly after pumping stops. Water quality measurements were stable during the test and suitable for snow making pruposes. The results support Council’s groundwater licence application (up to 19 megalitres per year) and indicate a low likelihood of impacts on nearby groundwater users and shallow groundwater dependent ecosystems.