Tank Removal, Soil Validation, Groundwater and Soil Vapour Assessment

EHS Support supervised the excavation and removal of two underground petroleum storage tanks at a winery in Victoria. The project included excavating and removing contaminated soil, followed by sampling the excavation walls and floor to confirm the absence of petroleum hydrocarbons.  

Additionally, EHS Support provided oversight of the drilling and installation of three groundwater wells and two soil vapor bores. Samples from the wells and bores were analysed to assess vapor risks for workers and the public in the newly developed cellar door area. 

See more of our project experience.